Previous Studies

In 2011, a feasibility report was prepared by the Association of Drainage Authorities in conjunction with the Environment Agency and the South Cumbria Water Level Management Group.  A copy of the report can be downloaded as a pdf file by clicking on the following link:-Initial Feasibility Report for the Lyth Valley.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s